扫黑风暴在线观看免费完整版未删减|电影苹果完整版未删减内容|国产首页|沙丘国语电影完整版在线观看,国产一级影片,老炮儿电影未删减完整版下载,www 俺来也

軟題庫 學(xué)習(xí)課程
當(dāng)前位置:信管網(wǎng) >> 在線考試中心 >> 試題查看
試題題型【單選題】
試題內(nèi)容

Many of the activities performed during the preliminary investigation are still beingconducted in  (1) , but in much greater depth than before. During this phase, the analystmust become fully aware of the  (2)  and must develop enough knowledge about the(3)  and the existing systems to enable an effective solution to be proposed andimplemented. Besides the  (4)  for process and data of current system, the deliverablefrom this phase also includes the  (5)  for the proposed system.
(1)A、analysis phase
B、design phase
C、implementation phase
D、maintenance phase
(2)A、main symptom
B、root problem
C、final blueprint
D、data specification
(3)A、hardware environment
B、testing environment
C、software environment
D、business environment
(4)A、logical models
B、physical models
C、design models
D、implementation models
(5)A、hardware and software specification
B、system performance specification
C、formal requirements definition
D、general problem statement

查看答案

相關(guān)試題